Project · industrial

Polyurethane resin flooring at Whyte & Mackay, Grangemouth

We laid about 285 m² of polyurethane resin flooring at Whyte & Mackay in Grangemouth, around stainless steel pipework, valve manifolds and plant that stayed in place. The concrete was mechanically prepared and repaired, then finished in a 9 mm Vebrocrete PU HF system in mid-grey, with the movement joints reinstated.

Sector
Industrial
Location
Grangemouth
Client
Whyte & Mackay

Have a similar project?

The problem

The floor of this process plant at Whyte & Mackay in Grangemouth was bare concrete, in a facility that stayed operational. Stainless steel pipe racks, valve manifolds and plant stand on it, and none of it could be moved for the work. The new floor had to be laid around every frame, plinth and floor drain.

Our solution

All plant was sheeted in polythene to keep dust and resin off the stainless steel. The concrete was then mechanically prepared to remove the weak surface layer and give the resin a sound key, and localised repairs were made to the substrate. The prepared floor is the pale, scored surface in the before photos.

We then installed a 9 mm Vebrocrete PU HF heavy-duty polyurethane system across about 285 m², in a mid-grey finish. The resin was detailed around the existing equipment, machinery and pipework, up to the base of each frame, manifold and drain channel, so there are no gaps for liquid or dirt to collect. The movement joints were reinstated through the new floor.

Products and systems used

Area
About 285 m²
Protection
Plant, pipework and manifolds sheeted in polythene
Preparation
Concrete substrate mechanically prepared
Repairs
Localised repairs to the concrete
System
Vebrocrete PU HF heavy-duty polyurethane, 9 mm
Finish
Mid-grey
Detailing
Around equipment, machinery and pipework
Joints
Movement joints reinstated

The result

The plant now has a continuous, hard-wearing polyurethane floor built for a demanding industrial environment, running up to the plant without gaps. The before and after photos above are taken from the same points, so the change can be compared directly.

  • Ground concrete floor in an aisle between stainless pipework, with plant sheeted in polythene before resin flooring

    01 / Before

  • Long view of a prepared concrete floor in a plant room, with protected equipment along both walls

    02 / Before

  • Ground concrete floor beside a stainless steel pipe rack and floor drain, ready for resin

    03 / Before

  • Cream resin floor laid around the base of a stainless steel valve manifold

    04 / After

  • Cream resin floor in an aisle between stainless pipework and a row of valves

    05 / After

  • Finished grey resin floor beside a stainless steel pipe rack in a process plant

    06 / After

  • Grey resin floor between stainless steel pipe racks in a process plant, freshly finished

    07 / After

  • 01 The valve aisle with the concrete ground and the plant sheeted in polythene.
  • 02 Prepared concrete down the length of the plant room.
  • 03 Prepared concrete beside a pipe rack and floor drain.
  • 04 Cream resin finish laid tight around the base of a valve manifold.
  • 05 The finished valve aisle in cream resin.
  • 06 Grey resin finish beside the same pipe rack.
  • 07 Grey resin finish between the pipe racks in the main hall.

Industrial Resin Flooring & Floor Repairs

Hard-wearing resin flooring and concrete floor repairs for industrial premises.

View the service
Access ramp finished in pale grey anti-slip MMA resin between galvanised handrails

Another project · commercial

Disabled access ramp refurbishment, Aldi, Carluke

Have a similar project? Request a survey.

Send us photos of the problem and where it is. We will tell you what we think is causing it and arrange a survey.

CHAS Accredited Contractor

CHAS accredited contractor.
2n Thorter Way, Dundee DD1 3AY.

Tell us about your project

Share a few details and we'll get in touch.

Up to 5 files, 20 MB in total. JPG, PNG, HEIC or PDF.

We'll only use your details to respond to your enquiry. Privacy policy.

CallDiscuss your project